Why handover fails
Most procurement treats training as a line item at the end. By then the budget is spent and the operators have never seen the system.
This is the checklist that prevents it.
The checklist I run before calling a system delivered, so the team can keep it alive without me.
Most procurement treats training as a line item at the end. By then the budget is spent and the operators have never seen the system.
This is the checklist that prevents it.